G&M Services - Case Study 6


Warwick Sleeper Cabin Project – during COVID

PROJECT OVERVIEW

G&M installed 66 deluxe single sleeper cabins in Warwick, with G&M being responsible for all electrical, mechanical & civil works.

These cabins were for essential staff remaining on site during the first Covid lock down. Ensuring that electricity and gas networks could remain functional throughout the crisis.

The pods were installed into 2 separate sections of the site, so that essential  staff could be segregated, avoiding a cross contamination if Covid was discovered.

Due to the importance of the delivery time for this contract our operations and site managers remained on site throughout the five week duration of the contract. Their experience helped  with decisions, fullfilling contract obligations on time on budget and executed safely.

SECTION ONE INSTALLATION

CIVIL ENGINEERING:- Vacuum excavation of trenches, plinth installation & ductwork. Install a road barrier & handrail for additional protection of new Distribution Fuse Board.

ELECTRICAL SERVICE:- Installation of new cable IP65 36-way DB mounted on the plinth. Install  sleeper pods & communal facilities. Test & Certificate all to BS7671 standard.

WATER SUPPLY:- Install a newr main from boiler room to utilities plinth with isolation points. Install to each accommodation pod with isolating valve. Each pod having local isolation. Chlorination & certification of water supply on completion.

SECTION TWO INSTALLATION

ELECTRICAL SERVICE:- Install a 6-way TPN Panel Board via a new cable containment system, on the underside of the foot bridge & a five sub-mains to local DB’s to supply 41 pods.

Test & Certificate all to BS7671 standard on completion.

WATER SUPPLY:- Install a water supply to each pod with isolating valve.

              CONTACTS - Herne Bay:+44(0)1227 371 133 • Hoo:+44(0)1634 255 475 •